Customization: | Available |
---|---|
After-sales Service: | 24 Hours Online |
Warranty: | 5 Years |
Still deciding? Get samples of US$ 30/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1.Raw material parameters | |
Material | ST37 (Q235) |
Plate thickness | 1.0~ 4 mm |
Material properties | Tensile strength σb≤470MPa Yield limit σs≤235MPa |
Board width | 400~1500mm |
Inner diameter of coil | Φ508mm/Φ610mm |
Coil outer diameter | ≤Φ1800mm |
Maximum coil weight | 15000kg |
2.Finished product parameters | |
Strip inner diameter | Φ508mm/Φ610mm (plus rubber boots) |
Strip outer diameter | ≤Φ1800mm |
Maximum rewinding weight | 15000kg |
Minimum strip width | ≥90mm |
Width accuracy | 0.15mm |
Shear burr | 5% plate thickness, |
Strip straightness | 0.5mm/1000mm(genuine coil, width>100mm) |
3.Equipment parameters | |
Number of slitting strips | 16 strips (thickness<2.5mm) 10 strips (thickness<4mm) |
Slitting speed | max100m/min |
Total power | About 380KW |
Production line area | 27mx12m (length x width) |
4.Energy medium requirements | |
power supply: | Supply voltage: three-phase 380V Voltage fluctuation: ±5% Frequency fluctuation: 50HZ±1% |
Compressed air | Air supply pressure: 0.4~0.6Mpa (dry air source) Air supply: 500L/min |
Hydraulic oil: | N46 anti-wear hydraulic oil. |
Equipment Composition
No. | Name | Quantity |
Remark |
1 | preparation table | 1 | |
2 | loading car | 1 | AC2.2kw |
3 | Uncoiler + Auxiliary Support | 1 | DC22kw-1000rpm |
4 | Pressing lead device | 1 | |
5 | Pinch straightening machine | 1 | DC37kw-1000rpm |
6 | flush shears | 1 | |
7 | 1# looper bridge | 1 | |
8 | Guide centering device | 1 | |
9 | pinch roller | 1 | |
10 | Slitting machine | 1 | DC75kw-1000p |
11 | Side wire coiler | 1 | AC2.2kwX2 |
12 | Belt threading table and tail pressure plate | 1 | |
13 | 2# looper bridge | 1 | |
14 | Strip separation device | 1 | |
15 | Tension table | 1 | |
16 | Pinch roller + coil shearing machine | 1 | |
17 | Steering rollers and feeder guides | 1 | |
18 | Winder + reel support | 1 | DC110kw-750rpm |
19 | discharge car | 1 | AC2.2kw |
20 | Hydro-pneumatic system | 1 | No hydraulic oil, no air source,AC11kw |
21 | Electrical System | 1 | |
22 | Inline oil pipe, gas pipe, cable | 1 | |
23 | Anchor bolts and accessories | 1 |
Rack roller diameter 220mm, wrapped with polyester glue, with groove in the middle | |
The oil cylinder is lifted and lowered, and the four guide columns are guided. | |
The car disc is driven by the motor and moves along the rail. | |
The trolley has a cable and oil pipe protection drag chain. | |
Lift cylinder---1 | φ180X750St |
Mobile motor---1 | AC2.2KW-4P, frequency conversion speed regulation |
Walking speed | 6m/min |
Weight | 20T |
The upper and lower rollers of the pinch rollers are covered with polyurethane glue | Diameter of the rollers | Φ220m |
|
The straightening roller |
Diameter | Φ150mm | |
Materia | 42CrMo plated with hard chrome | ||
Layout | Up 1 down 2 | ||
pinch roller drive |
By the DC motor through the gearbox and the universal joint |
Guide rollers | Quantity | 6 (3 on each side) |
Material | GCr15 chrome plating | |
According to the width of incoming material, the distance and position of two sets of guide rollers can be adjusted electrically, and the digital display shows it. | ||
Motor | with brake |
1. OEM Design&Production
Our active engineer and design team can make the special machine according to customer's special requirements.
2. Delivery in Time Assurance
We assure the machines your ordered will delivered at promised time
3. Free Installation&Training
We provide the installation and training by online video support; local installation and training service team; send engineer for installation and training; installation operation video provided
4. Your Payment Protection
You can pay through Alibaba to protect your advance payment
5. Online Factory Inspection Service
The factory inspection before your order, will be provided online by video meeting app, like room, wechat,skype etc..
6. Long Life Maintenance of Machine
We keep provide the maintenance for all machine life
7. International Third Party Inspection Supported
You can appoint the international third party party, such as TUV, SGS,BV, do inspection before shipment
1. Q: Are you a Manufacturer or a trading company?
A:We are a professional manufacturer with more than 15 experience in manufacturing, assembling and selling in this field. We have our own factories as well as trading companies
2. Q: How long have your factory been in this field? And how many staff do you have?
A: We have been in this field mode than 12 years since the year of 2008, total staff more than 100.
3. Q:Where are you and how can I visit you?
A: Our factory located in Jinan City, Shandong Province China, contact us before your visit in order that we can arrange the good reception.
4. Q: Can you provide a customized solutions?
A: Yes, our engineers are pleased to listen your idea and customized design is available
5. Q: What about the warranty?
A: We provide 12 months warranty since the machine arrival. free charge of spare parts and regularly maintenance service.
6. Q:How about the delivery time ?
A: The delivery time is different on different products.We never receive any complain from our customers for the delivery time
7. Q: What about the package and shipment , worry about damage in shipping .
A:The machine will be packaged by multilayer plastic wrap for anti-humidity on the sea. The strong steel wire roops will be used for fix the machines in container to avoid any damage in transportation.
8. Q: What kind of payment does your company support?
A: T/T, 100% L/C at sight, Cash, Western Union are generally accepted.
9. Q:Do u support on installation and training?
A: Yes, we provide engineers to your site for installation and training, if conditions not allowed, we provide team work by video conference for installation gaudiness on line.