Customization: | Available |
---|---|
After-sales Service: | Provide |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Production process
The production line is carried out according to the following technological process:
Uncoiler → leveler → looper (material storage)→ servo feeding → multi-station punching machine (cut off)→ molding main machine → finished product discharge
Describe type | C-beam model | Z-beam model |
Bottom (H) | 120-350mm | 120-350mm |
Flank (b) | 40-100mm | 40-100mm |
Small side (c) | 15-25mm | 15-25mm |
Punching distance (H) | 40-150mm | 40-150mm |
Plate thickness | 1.0-3.5mm | 1.0-3.5mm |
1.We adopts individual archway stands for rollers station, more strong and rigidity structure than other suppliers in china.
2.Individual gearbox for each archway rollers set, to assure the precision of the profile.
3.All of the machine main body and parts are quenched, with higher hardness(HRC58-62) and wear resistance, while other suppliers only rough steel welded.
4.The rollers material is American D2 and D3 standards, with long service life and low maintenance cost.
5.Professional Germany roller design software-Copra.
6.Long machine life, all of our machines can be used stable performance for more than 10-15 year, while other small and low quality supplier's machine only can be used for 1-2 years.
1 Lifting the machine into container
2 Disassemble and pack with film for anti-humidity
3 Machine trial before dispatch
4 Loading the packages to container
5 Fix with steel wire ropes in container to avoid damage
6 Close and sealthe container
7 Transport container to the port
8 Ships and our machines go to the destination port